Skip to main content
A fresh render coat on the lower walls of a room following damp proof course work

Latest work

Recent damp proofing and preservation work

Photographs from real jobs carried out by our own team across North Tyneside, Newcastle and Northumberland. Nothing staged, nothing bought in from a picture library.

Gallery

Damp proofing is disruptive work, and we think you should see that before booking anyone. These photographs show the real stages, from walls hacked back to brick through to a skimmed finish ready for decoration. Select any photograph to view it full size.

The stages in the photographs

From bare brick to ready to decorate

Most damp proofing jobs follow the same four stages. Here is what you are looking at in the gallery above.

  1. Stage 1

    Hacked back to brick

    Salt contaminated plaster is taken off back to sound masonry. It looks drastic, but leaving it in place would let the salts come back through the new finish.

  2. Stage 2

    Damp proof course and membrane

    A new chemical damp proof course is injected into the mortar, and tanking membrane is fixed where a wall needs a physical barrier against moisture.

  3. Stage 3

    Render coat

    The brown layer in many of the photographs is a salt resistant render. It protects the new finish from any salts left in the brickwork behind it.

  4. Stage 4

    Skimmed and ready to decorate

    Once dry, the render is skimmed to a smooth finish and the room is left tidy and ready for decoration.

Common questions

About the work shown here

Want this standard of work in your property?

Every job above started with a free survey. Book yours and you will get the cause confirmed, the work set out in writing and a fixed price, before anything starts.